According to GOMN.com the bridge which measures 198 feet long from end to end will be placed on the Nicollet Mall and cross over 9th street with two lanes of traffic going underneath around 14 feet below.

The bridge will be covered with snow thanks to 12 dump trucks, and then will be taken apart and brought back to Hayward to get ready for the big race  (The American Birkebeiner) on February 22nd.

More From MIX 108