Heads up to Canal Park and Park Point drivers, the Aerial Lift Bridge will be reduced to one lane due to general maintenance starting June 9th.

The general maintenance is set to start at 9 am on June 9th and will consist of crews pressure washing the Lift Bridge to remove rust and grime. The bridge will be reduced to one lane, and one way vehicle traffic with signals controlling the direction and access of vehicles across the Bridge. The project should be completed by 3 pm as long as nothing goes wrong.

More From MIX 108